• GQ-FLSeries Flexible Mounting System
  • GQ-FLSeries Flexible Mounting System
GQ-FLSeries Flexible Mounting System
GQ-FLSeries Flexible Mounting System
+

GQ-FLSeries Flexible Mounting System

Intelligent tracking algorithm can increase power generation by about 2%.

View Similar Products

Tag List

  • Description
  • Product Features

    Large Span

    ● Near 40m large span design, suitable for agricultural and photovoltaic projects such as fishery and photovoltaic projects

    Reduce the amount of pile foundation

    ● As low as 94 piles per megawatt

    Adaptable to large inclination angles

    ● Allows for larger tilt angles of the components, increasing power generation

    Easy Installation

    ● Tightening adjustment of steel strands is achieved through a special tensioning structure and screw threads

    Strong Wind Resistance

    ● The lower layer adopts a unique double-cable, flared suspension structure; effectively improving the overall ability to resist wind loads, front and rear truss-type connections, and upper and lower double-layer cable structures, effectively reducing the sag ratio of large-span structures and improving the overall wind resistance of the bracket

    Lower Cost

    ● By optimizing the structure and the arrangement of steel strands, the investment cost is reduced by 2~5% compared to traditional power plants while reducing the amount of pile foundation

    GQ-T1 System Parameters

    Component Arrangement Single-plate vertical placement
    Maximum Span 30~60M
    Component Arrangement Back Lock Installation
    Number of installable components 300 pieces per row
    Maximum Tilt Angle 25°
    Design Wind Speed 33m/s, adjustable according to project location
    Corrosion Protection Hot-dip galvanizing
    Steel Strand Specifications φ12.7, 1860MPa

GQ-FLSeries Flexible Mounting System

Intelligent tracking algorithm can increase power generation by about 2%.

Product Category

Tag List

GQ-FLSeries Flexible Mounting System

Check Now

Note: We will contact you within one business day. Please pay attention to your email.